KOBUS pipe puller

The Kobus Pipe Puller is a trenchless pipe replacement technique.  The Puller extracts lead, galvanized iron, copper and plastic service pipes  QUICKLY and SAFELY and tows in a new pipe in a single operation.  

The powerful pulling winch, which is mounted on a compact excavator, removes service pipes up to 1-1/2″ diameter and 85 feet long in minutes!

Pipe puller concept

The Pipe Puller concept is a simple, trenchless technique for pipe replacement.  Firstly, a strong steel pulling cable is fed through the old pipe which is being removed.  The pulling cable has a special pulling attachment on one end and this engages with the old pipe.  The other end of the cable is fixed onto the Pipe Puller spool which is driven by two powerful hydraulic motors.  The spool safely and continuously winds up the pipe as it is removed from the ground and a new copper or polyethylene pipe is towed into place following the same pathway as the old pipe. 

The method minimizes the risk of damaging any nearby utilities, removes the environmental hazard from the decommissioned pipe, reduces size of excavations and cost of reinstatement, and, most importantly, it is SAFE for operators and members of the public.

Kobus pipe puller positioned in excavation replacing lead water pipes

The proof is in the pulling...

The Pipe Puller is proving a popular trenchless pipe replacement technique with a number of our customers in the USA and Canada.  As a result, thousands of old lead pipes have been removed already and many more are being replaced each day.

But don’t take our word for it.  This short video shows a 1″ lead pipe being replaced with a new poly service between the curbstop and the basement of a property. 

If you like what you see, get in touch…

KOBUS PIPE PULLING EQUIPMENT

EQUIPMENT

ACCESSORIES

CONSUMABLES

LATEST NEWS

Flint lead pipe replacement program delayed

Michigan State threaten to pull plug on funding Progress on the lead pipe replacement program in Flint, MI, has apparently been delayed during 2018 due to a change in how the location of lead pipes is being undertaken.  The Mayor of Flint, Karen Weaver, has reportedly changed the method of identifying which properties have lead

Read More »

NASTT No Dig Show – March 2019

Kobus will be exhibiting at the NASTT No Dig Show in Chicago March 18th – 20th 2019 We are delighted to announce that KOBUS will be exhibiting at the North American Society of Trenchless Technology ‘No Dig Show’ in Chicago March 18th to 20th 2019. This will be our first exhibition in the USA and

Read More »

CONTACT US

Kobus

Headquarters
Unit 9, Mercian Park
Felspar Road
Tamworth, Staffordshire
B77 4DP
United Kingdom

CALL 00 44 1827 33 88 55